Execution of complete excavation and structural concrete works for "Zone 3" within the Al-Ezdihar Park project in Riyadh for the , Horizon (Al-Afaq Company). The scope covers 3 administrative, commercial, and residential buildings across a total footprint of 19,000 sqm, with each building comprising 8 floors (including 2 basements with ramps). We execute the entire structural scope from excavation up to the 8th floor using our dedicated in-house teams (surveyors, steel fixers, and carpenters) and our own steel formwork systems. Commenced in April 2026 for a 9-month duration, the project has achieved a 75% completion milestone to date.
Managing and executing excavation and structural concrete works simultaneously across 3 multi-use buildings over a massive 19,000 sqm footprint within a tight 9-month schedule, while handling the precise engineering requirements of two basement levels and their access ramps without workflow delays.
Taking full turnkey responsibility for the structural phase from initial excavation up to the completion of the 8th-floor skeleton. By deploying our integrated in-house workforce (surveying, steel fixing, and carpentry teams) alongside our proprietary steel formwork and shuttering systems across all three buildings in parallel, we ensured maximum speed and structural precision, successfully reaching 75% completion on schedule.
1 / 12
Have a Similar Project?